Sunday, April 27, 2014

انسان طبيعت معماري تحليل فضاي شهري تكنولوژي هاي نوين صنعت ساختمان معماري اسلامي فلسفه و معماري ادبيا


انسان طبيعت معماري تحليل فضاي شهري تكنولوژي هاي نوين صنعت ساختمان معماري اسلامي فلسفه و معماري ادبيات و معماري معماري داخلي (دكوراسيون) اسكيس فولدينگ معماري بيونيك معماران عصر مدرنيسم معماران پست مدرنيسم متفرقه فضاهای تجاری و اداری مسکونی موزه هتل آموزشی فضای نمایشگاهی فضای تفریحی و خدماتی آسمان خراشها off broadway shoes و برجها هنر چیدمان ( اینستالیشن آرت ) ضوابط و مقررات کاربریها
Architects: Gonzalo Mardones Viviani Location: Santiago , Chile Contractor: Carlos Marchetti Engineering: off broadway shoes Ruiz y Saavedra Client: Miele Lighting and Domotic system: off broadway shoes Ikatu and Bang&Olufsen Project Area: 1,091.10 off broadway shoes sqm Project Year: 2010-2011 Photographs: Nicolás Saieh
Chosen by Miele for this architecture competition, the site is a residential neighborhood with residences in low, medium and high density, surrounded by parks and squares. It is in close proximity to the new City Council Building and Bicentenario Park.
Our architectonic proposal is a building that opens to the corner (the most public place) in a play of façades of concrete and inclined crystals. This façades permits light to reflect, off broadway shoes and the transparency of the building creates a large display window for the street, both people and vehicles.
The interior result of the idea permits the connectivity of all the levels. Spaces are an architectonic labyrinths path that are even penetrate the underground spaces, a unique possibility of light and natural ventilation.
A permanent in our work (sixth façade) is a double purpose: increase the land (scarce resource) and increase offices and exhibition area around to open and semi open spaces that combine intimacy and openness. Burying and open to the underground and enable a new landscape which highlights the compressed presence of near walls as a doorway to the sky.
The circulation path into the entire off broadway shoes building was created in red steel (red is the Miele corporate color) leaving a contrast to the materiality of the building, white concrete off broadway shoes with titanium dioxide incorporated. This red strip distinguishes over the white as a fauve and runs over all levels to the roof.
The roof is conceived as the fifth façade creating a big terrace with a bar, a meeting place in the height off broadway shoes of the foliages. From there can see the immensity of the Andes Mountain, the hills and the green of the neighborhood.
As in all our works, also we insist in the use of dividing walls as architectonic support (seventh façade). In this case the walls of both streets characterize a new panorama, making a new landscape possible and a new place for the building.
This project represents the culmination of ongoing dialogues between client off broadway shoes and architect, essential to our way of seeing and understanding off broadway shoes the architectural design process. In this as in many cases the client story allows many inspirations and ideas that integrate into the architecture. Building sustainability
The sustainability of Miele building is principally off broadway shoes by the use of the fifth, sixth and seventh façades. off broadway shoes These permits separate the building, heat and cold, creating natural isolation, ventilation and lighting. Other sustainable practices that were implemented include solar panels and gray water treatments.
Nicolas Saieh
second basement plan


No comments:

Post a Comment